A. Erosion and sediment control standards include
- Erosion and sediment control measures must utilize Best Management Practices (BMPs) and be sufficient to retain sediment on site.
- All temporary erosion and sediment controls will be installed on all downgradient perimeters before beginning land disturbing activity, and left in place and maintained until the site has been stabilized. All permanent erosion control measures must be installed and operational as shown in the design plans.
- Erosion and sediment controls shall meet the standards for the MPCA General Construction Stormwater Permit for projects disturbing more than 1 acre.
- Final stabilization (e.g., seed and blanket) of the site must be completed in accordance with the General Construction Stormwater Permit requirements.
- All on-site stormwater conveyance channels shall be designed and constructed to withstand the expected velocity of flow from a 10-year frequency storm without erosion.
- If the activity disturbs more than 1 acre of disturbed area, and the activity is taking place on a site where soils are currently disturbed (e.g., farm field), areas that will not be graded and stabilized as part of the development need to be seeded with a temporary or permanent cover before starting the proposed land disturbing activity.