A. For draining landlocked basins:
- Outlets are consistent with other portions of the VRWJPO Standards, as well as other local, state, and federal regulations.
- Analysis is completed of potential downstream, riparian, and habitat impacts of outlets; implementation results in no detrimental impact to property or natural resources.
- Runoff analysis for flows and water levels are based on a hydrograph method. A hydrograph is a graph showing changes in water flow or water level over time.
- The proposed post-installation hydrology (water distribution and movement) is consistent with peak runoff rate and volume controls.
- The outlet does not create adverse downstream flooding or water quality conditions, or affect stability of downstream water courses.
- The outlet maintains dead water storage, a volume with little to no current, in a basin or channel to the extent possible.
- Development contributing runoff to a landlocked basin incorporates best management practices to reduce the runoff volume to the extent possible.
For proposed alteration of waterways, public waters, public waters wetlands, or wetlands:
- Alterations or diversions are consistent with other portions of the VRWJPO Standards, as well as other local, state, and federal regulations.
- Analysis of potential downstream, riparian, or habitat impacts of alterations or diversions are completed and predict no detrimental impacts.
- The proposal demonstrates a reasonable necessity for the alteration or diversion to improve or protect public health and safety or to improve or protect aquatic resources.
- Unnecessary injury to upstream or downstream lands is avoided.
- The alteration provides greater benefit (positive impacts of drainage, dam or diversion) than harm (costs) to lands affected by the alteration.
- The alteration benefits the natural hydrologic system by returning, restoring, or maintaining its natural capacities.
All drainage alterations, diversions, and landlocked basin outlets shall be provided with stable outfalls and channels designed to withstand erosion during the 10-year, 24-hour precipitation event.
